Major Projects

Title Project Description Project Type Project Status
1001 EHB 1001 E. Hillsdale Blvd. Parkside Towers Office & R&D Proposal (UP2021-0036)

A Use Permit Modification request was received to allow Research & Development (R&D) use on floors four (4) through eight (8) at the Parkside Towers office development located at 1001 E. Hillsdale Boulevard – UP2021-0036

Planning Approved
1001 EHB UP2021-0043 1065 E. Hillsdale Blvd. Century Plaza Change of Use from Office to R&D Proposal (UP2021-0043, EA2021-0005, and RZ2021-0006)

A Use Permit was received requesting that the City allow up to 87,000 square feet of Research & Development (R&D) use at the existing 115,629 square-foot office building at Century Plaza located at 1065 E. Hillsdale Boulevard – UP2021-0043.

Planning Approved
1065 EHB Picture 1065 E. Hillsdale Blvd. Restaurant/Retail Pavilion (PR2020-0004, UP2021-0015, GP2021-0006, RZ2021-0007, and EA2021-0006)

Planning Approved
Gilead New Lab Picture 331 Lakeside Drive, Gilead Campus (UP2023-0079)

 An application was submitted by Delvin Harvey of Gilead Science, Inc. to demolish an existing office building and entitle a new  research and development building on the Gilead Campus. The proposed conceptual plans for the subject site include the following:

Planning Approved and Under Construction
388 Vintage Park Drive 388 Vintage Park Drive (EA2021-0001, RZ2021-0003, UP2021-0023, and UP2021-0024)

An Application was submitted by SteelWave and Helios Real Estate to redevelop the vacant El Torito restaurant into a new Class A life sciences office building.

The proposed conceptual plans for the subject site include the following:

Planning Under Construction
Fiber/node Installation Crown Castle Fiber/Node Installation

This project is currently approved and under construction which comprises the installation of 16 miles of Fiber Optic Infrastructure and 63 Wireless Cellular Nodes that are used to send and receive voice and data communications. This project will be ongoing for the remainder of 2024 and possibly into 2025.

Other Under Construction
Development Impact Fee

An Amendment to Title 3, Revenue and Finance of the Foster City Municipal Code to add Chapters 3.50 Park Facilities Impact Fee, 3.60 Transportation Impact Mitigation Fee, and 3.70 Public Safety Impact Fee to implement new Development Impact Fees including an amendment to Chapter 17.88 Affordable Housing Commercial Linkage Fee of Title 17, of the Foster City Municipal Code to update the City's Affordable Housing Commercial Linkage Fee

The Comprehensive Development Impact Fees and the Commercial Linkage Fee studies are available below and in the Files tab on this page:

Planning Approved
Parks & Recreation Image Foster City Recreation Center Rebuild Project (UP2023-0003/CIP 301-678/EA2023-0003)

A Use Permit to demolish the existing 32,000-square-foot recreation center and construct a new Foster City Recreation Center in approximately the same location. The new recreation center building would be two stories and a maximum of approximately 40 feet in height and approximately 40,000 square feet in size. The proposed project would also include improvements to Leo J. Ryan Park consisting of new outdoor gathering spaces, new landscaping, and restriped parking lots.

Planning Approved
Lift Station 59 Effluent Line Lift Station 59 Effluent Line Improvements Project (CIP 455-695)

The District has an ongoing program of maintaining and upgrading the wastewater system through the replacement of appurtenances that have reached the end of their useful life and various improvements to the wastewater system to improve redundancy and reliability. The Lift Station 59 Effluent Line Improvements Project (Project) includes various improvements to the District’s main lift station (Pump Station 59) located in the District’s Corporation Yard. Improvements include the replacement of the existing ultrasonic effluent flow meter with a new electromagnetic flow meter, the...

Capital Project In Progress
Median Modifications and Road Improvements Median Modifications and Road Improvements at Chess Drive and Foster City Blvd (CIP 301-635 & CIP 301-637)

The Median Modification and Road Improvements at Chess Drive and Foster City Boulevard Project is the combining of CIP 301-635 and 301-637. The two projects were developed as part of the Engineering Feasibility Study Final Report (May 2009) to address traffic related impacts from proposed development projects in Foster City. The projects are identified as Multi-Project #3, #4, #7, and #8 in the study. The project is being designed by the City’s design consultant, BKF Engineers, and the scope involves:

Capital Project In Progress
New Hotel New Hotel Development Proposal

An application has been submitted for proposed development of a new, approximately 83,190 square-foot, seven-story hotel and associated site improvements at the vacant lot situated at the southwest corner of Metro Center Boulevard and Shell Boulevard.  As proposed, the hotel would feature approximately 156 guest rooms and include a limited-service restaurant and bar, meeting space, rooftop terrace, and uncovered garden deck.  The building would be constructed on a raised podium above ground-level parking and would be surrounded by a surface parking field, accommodating approximately 141...

Planning Approved
Park System Master Plan Project Logo Park System Master Plan (CIP 301-682)

Several of Foster City's 24 beautiful parks are nearing 50 years old.  As part of the City's ongoing effort to properly and adequately maintain its Parks infrastructure and ensure the quality and diversity of the facilities, a Parks System Master Plan is necessary.  Development of a Master Plan for the Parks System will allow for future planning of projects and guide the overall direction of the City's parks program. 

Capital Project Budgeted
Neighborhood 5 PG&E Gas Line Replacement Project - Neighborhood 5

PG&E has announced that it will be upgrading their gas main line and services to homes on Coronado Lane, De Leon Lane, Vespucci Lane, De Soto Lane, Pizarro Lane, Lido Street, and Balboa Street. The project is anticipated to start on May 17, 2021 and should be completed by end of October 2021. Work activities will be limited to the hours between 8:00 a.m. and 5:00 p.m., Monday through Friday. Weather and other factors affecting safe working conditions may change the project's schedule.

Other In Progress
Pilgrim Triton Phase C/Laguna Vista Pilgrim Triton Phase C/Laguna Vista

Pilgrim Triton Phase C includes 70 townhouse-style condominium units known as Laguna Vista and 22 Workforce Housing Apartment units that are owned by the City of Foster City. The project also includes the enlargement and completion of the Pilgrim Triton Plaza park.

Construction began in late 2020 and is expected to be completed in late 2021-2022.

The 70 Laguna Vista units include 7 one-bedroom, 13 two-bedroom, 6 three-bedroom, and 44 four-bedroom units.

The 22 Workforce Apartment units include:

Planning Under Construction
Recreation Center Master Plan Project Recreation Center Rebuild Project (CIP 301-678)

The City Council first authorized a Recreation Center Master Plan Study as a component of the Fiscal Year 2016-2017 budget and received extensive public outreach during that fiscal year as a first step in developing a Recreation Center Master Plan. 

Capital Project In Progress
Lantern Cove Redevelopment of Lantern Cove Apartments

The proposed Use Permit Application is to add 420 new dwelling units and 518 new parking spaces on a 16.8-acre site known as Lantern Cove Apartments. The subject site is located to the south of Port Royal Avenue between the two points of intersections of Port Royal Avenue and Rock Harbor Lane. The subject site currently includes thirty-five 2-story apartment buildings containing 232 dwelling units, a leasing/amenity building, and 482 parking spaces. The site consists of a mix of surface and carport parking spaces providing a parking ratio of 2.08 parking spaces per dwelling unit.

Planning Under Review
SM 101 Express Lanes Project San Mateo 101 Express Lanes Project

The San Mateo 101 Express Lanes Project is a multi-year, multi-agency project initiated to reduce traffic congestion and encourage carpooling and transit use on U.S. 101 in San Mateo County.

The project will create 22 miles of express lanes on U.S. Highway 101 from I-380 in San Bruno to the San Mateo County/Santa Clara County border. The San Mateo 101 Express Lanes will then seamlessly connect to the express lanes being constructed in Santa Clara County.

Other Under Construction
Lagoon Pump Station Seismic Improvements at Lagoon Pump Station (CIP 301-690)

The City of Foster City, as part of a program to minimize service disruptions which could result from a seismic event,  has identified needed repairs and upgrades to the Lagoon Pump Station.   The lagoon pump station pumps water from lagoon into the Bay.   

The Project includes:
•    Strapping down equipment within the Building;
•    Retrofitting the Overhead Doors Frames;
•    Repairing and reconstructing the walkway on the lagoon-side of the Building; and 
•    Retrofitting the walkway on the bay-side of the building.

Capital Project Under Construction
Street Rehabilitation and Park Pathway Restoration (2023-2024) (CIP 301-716)

This project consists of striping removal, crack sealing, pavement grinding, localized asphalt concrete repair, asphalt overlays, slurry seal, pavement reconstruction, curb and gutter repair, curb ramp installment/replacement, installation of traffic striping and markings, installation of traffic signage, grade adjustments, bituminous layer repair, paver replacement, and utility adjustments.

Capital Project Approved
Water Tanks 1, 2, and 3 Water Tanks and Facilities Improvements Project (CIP 405-660)

The Water Tanks and Facilities Improvements Project includes:

  • Repair of the corrosion and deteriorated coating system on the three steel water tanks;
  • Seismic improvement to Tanks 1 and 2; and
  • Seismic improvements to the water booster pump station. 

Design is underway.  

For more information regarding the Capital Improvement Project, please  Public Works Engineering at (650) 286-3270.

Capital Project Under Construction