Foster City Boulevard Median Modifications Improvements Project (CIP 301-635)
Description
The Foster City Boulevard Median Modifications Improvements Project CIP 301-635) was developed as part of the Engineering Feasibility Study Final Report (May 2009) to address traffic related impacts from proposed development projects in Foster City. The specific project is identified as Multi-Project #3, in the study. MP #3: The project will lengthen northbound left-turn lane on Foster City Boulevard at Chess Drive. Increasing the length of the existing 525-foot northbound left-turn lanes from Foster City Boulevard at Chess Drive to 650-feet will prevent queues from extending out of the turn lanes and blocking through traffic on Foster City Boulevard. The project was designed by the City’s design consultant, BKF Engineers.
Bids for the construction of the project were solicited in Spring 2025. A construction construct was awarded to Spekten Engineering on May 19, 2025.
Construction will commence in September 2025 and anticipated to be complete in early October 2025.
For more information regarding this Capital Improvement Project, please contact Jerrick Carandang, Associate Civil Engineer, in the Public Works Department at jcarandang@fostercity.org
Additional Documents & Resources
Contact Information
Public Works Department
Engineering Division
610 Foster City Boulevard
Foster City, CA 94404
Phone: (650) 286-3270
Email: publicworks@fostercity.org
Monday - Friday, 8 am - 5 pm
Maintenance Division
100 Lincoln Centre Drive
Foster City, CA 94404
Phone: (650) 286-8140
Email: publicworks@fostercity.org
Monday - Thursday, 8 am - 4:30 pm
Friday, 8 am - 3:30 pm
(By appointment only)